The Rum Runner Racing Fast Electric R/C Boating Forums

Go Back   The Rum Runner Racing Fast Electric R/C Boating Forums > Blogs > 1/10 Scale building
Blogs FAQ Calendar Mark Forums Read

Photos, commentary and description of my building projects
Rate this Entry

Pepsi Build Next Chapter

Posted 07-21-2010 at 07:08 PM by dauminator

In the photos above, you see the keel assembly which si made up of three 1/32" pieces sandwiching two 1/8" balsa fillers. This is how I provide for the 5/32" wide skeg trunk.

The bulkheads that form the transom of the bump and primary steps are similarly made up.

With the bulkheads mounted to the keel, the sheer pieces and the inboard longitudinals and aft floor glued, it is time to start putting in the chine stringers, bottom pieces and binishingout the steps.
Attached Thumbnails
Click image for larger version

Name:	Btm_Aft_Lkg_Fwd.jpg
Views:	218
Size:	32.7 KB
ID:	11   Click image for larger version

Name:	Btm_Port_Lkg_Aft.jpg
Views:	226
Size:	71.0 KB
ID:	12   Click image for larger version

Name:	Transom_Aft_Floor.jpg
Views:	206
Size:	37.0 KB
ID:	13   Click image for larger version

Name:	Primary Step Framing.jpg
Views:	206
Size:	53.0 KB
ID:	14  
Posted in Uncategorized
Views 4229 Comments 0 Edit Tags
« Prev     Main     Next »
Total Comments 0

Comments

 

All times are GMT -4. The time now is 03:24 AM.


Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2021, Jelsoft Enterprises Ltd.